Friday, March 16, 2012

DAY 3 LOG - Project 3.3.1 Design Problem

(NOTE: we took a break from this project to work on programming for another one involving the Lego Mindstorm's NXT kit that Mr. Olsen ordered. Therefore, we did not get much done today.)
  • Collected the sketches from each member of the project.
  • Achieved full documentation of each sketch (should be posted soon).
  • Made an online draft for the final program in relation to my design idea (using Word, not RoboPro).
Very little was completed today, but all the preparations have been made, so after a program has been built for the robot at school at home, there should be no further distractions by the middle of next week.